Penmann recently finalised a tailored HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a fully engineered ventilation and climate control system designed to satisfy demanding hygiene and production criteria. The scope included the complete lifecycle delivery of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://bookmarkangaroo.com/story20780440/penmann-completes-major-hvac-upgrade-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2