The designs also include an enormous battery at the site, to be sure surplus power might be saved with the evening, in addition to a 220 kV transmission line that can connect the challenge into the North Star sub-station, in close proximity to where a fresh 100 MW solar challenge https://citypointsolar.com.au/solar-panel-installation-perth/