In the beginning, the Jai Hind metro station was prepared to be elevated. Having said that, the AAI objected which the elevated stretch up to the airport could possibly pose a menace to aircraft, Hence the route was even more reworked and the station was shifted underground, 150 m from https://railway-group-d-jobs65543.gynoblog.com/31422689/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf